Rev. 01 - 05/2026

TWO-CHAMBER BIOLOGICAL SEPTIC TANKS

  1. TWO-CHAMBER BIOLOGICAL SEPTIC TANKS
  2. INSTALLATION INSTRUCTIONS
  3. GUARANTEE

TWO-CHAMBER BIOLOGICAL SEPTIC TANKS
SEWAGE DIVISION › VASCHE SETTICHE › bicamerali

OPERATION

Two-chamber septic tanks constitute a reliable device for the primary treatment of effluent. The treatment systems are passive, extremely stable, simple and inexpensive. They are used for primary treatment of domestic sewage from WCs and household drains or the like.

The configuration of the tank forces the sewage to pass through the liquid mass contained in it. The slowing down of the flow allows sedimentable solids and substances of specific weight less than that of the water to separate. Furthermore, an anaerobic fermentation process is triggered with the resulting solubilisation and synthesis of part of the suspended solids. In this way, the effluent leaving the tank has a limited concentration of solids, transformed for the most part into dissolved and colloidal solids.

Septic tanks are only used when replacing existing systems, although some local authorities still allow their installation. They must be preceded by a grease separator, so that the treated effluent can be discharged underground (where provided for by local regulations), to a public sewer or it can be sent for secondary treatment for further refinement and discharge to a suitable receptor.

SPECIFICATION ITEM

One-piece, two-chamber septic tank for primary treatment of domestic sewage or the like, in polyethylene (PE), manufactured by an ISO 9001/2008 certified company, compliant with Legislative Decree No. 152 of 2006 and C.I.A. Resolution dated 04/02/1977, for underground installation, equipped with: PVC inlet pipe with watertight gasket and 90° bend to slow down and distribute the flow, and with a PVC outlet pipe with watertight gasket, with deflector T and submerged pipe, biogas vent and inspection, maintenance and flushing manhole covers; optional extensions can be installed on the inspection covers. Two-chamber septic tank mod. ....................... useful volume .................. l, dimensions ................x...............x............cm

SIZING AND STANDARDS

The sizing, which is not applicable to new installations, follows the guidelines provided for by the Interministerial Committee resolution dated 4/2/1977, in which a minimum retention time of 12 hours is required for the daily flow discharged (150-200 l/P.E.) and at least 50 l per capita for the sludge storage, for a total of 125-150 l/P.E. A correctly maintained plant can treat effluent in accordance with that provided for by Legislative Decree n° 152, part 3 dated 03/04/2006.

 

The following table reports the design data used to size the Rototec septic tanks:

 

Daily flow rate

150-200 l/P.E.

Organic load per capita

60 gBOD5/P.E.xd

Residence time

12 h (at daily flow rate)

 

Sludge storage volume

50 l/P.E.

RANGE OF MODELS
TWO-CHAMBER BIOLOGICAL SEPTIC TANKS

Attention: by clicking on the Article codes you will access the relevant technical page with Attachments and Technical Drawings in DWG

ItemModelLength
mm
Width
mm
Ø
mm
Height
mm
Inlet height
mm
Outlet height
mm
Ø I/O
mm
Cover 1Cover 2Extension 1Useful Volume
lt
PE
XSEB400X22 x Exagon//790800635315110CC400CC130CPP455424
XSEB500X22 x Exagon//950900720700110CC400CC130CPP459266
XSEB700X22 x Exagon//1150923630610110CC400CC200PP45,PP3011328
XSEB900X22 x Exagon//11501048750730110CC400CC200PP45,PP30140010
XSEB1000X22 x Exagon//11501221933913110CC400CC200PP45,PP30177614
NSEB1200X22 x Elipse1900708/163012501230110CC300CC300PP35,PP35240018
XSEB1250X22 x Exagon//1150147811751155110CC400CC200PP45,PP30218018
XSEB1500X22 x Exagon//1150177914651445110CC400CC200PP45,PP30276822
XSEB1750X22 x Exagon//1350167212851265110CC400CC300PP45,PP35329024
NSEB1700X22 x Elipse1900708/214017601740110CC300CC300PP35,PP35355026
NSEB2100X22 x Corrugato//1350197515401520110CC400CC300PP45,PP35390030
NSEB2600X22 x Corrugato//171014501000980125CC400CC300PP45,PP35412232
NSEB3200X22 x Corrugato//1710172512401220125CC400CC300PP45,PP35505040
NSEB3800X22 x Corrugato//1710195515251505125CC400CC300PP45,PP35635048
NSEB4600X22 x Corrugato//1710222517451725125CC400CC300PP45,PP35767060
NSEB5400X22 x Corrugato//1950225017001680125CC400CC400PP45,PP45915672
NSEB6400X22 x Corrugato//1950253020001980125CC400CC400PP45,PP451058684
NSEB7000X22 x Corrugato//2250236718501830160CC400CC400PP45,PP4513868110
NSEB9000X22 x Corrugato//2250262520702050160CC400CC400PP45,PP4515646140
Lung = Length; H = Height; Ø = Diameter; AE = people equivalent;
USE AND MAINTENANCE

An excessive accumulation of putrescible material at the bottom of the tanks can cause uncontrolled anaerobic digestion phenomena, leading to an over-production of biogas and the development of malodorous emissions. Furthermore, the reduction in available volume in the digestion compartments and the excessive production of gas bubbles will cause the settled material to rise, thus causing deterioration in the quality of the treated effluent.

 

For this reason, according to the loads feeding the tank, between 1 and 4 inspections a year are to be foreseen, with removal of the sludge if necessary. It is sometimes recommended not to remove all the deposited sludge, but to leave approximately 1/10 of the sludge that has deposited in the tank; this accelerates re-start of the processes. The use of the Rototec Bio-activator is highly recommended to trigger the biological processes more quickly, thus limiting the number of sludge removal operations and reducing the risk of bad smells.

 

WHAT TO DO

WHEN

HOW

Inspect the septic tanks

From 1 to 4 times a year

Open the covers on the inspection holes and check the level of sediments

Extract the bottom sludge, clean the interior and the inlet and outlet pipes

Every 6/12 months

Contact a licensed waste disposal company

N.B. the frequency of operations will depend on the incoming organic load.

 

Prohibitions:

 

Warnings:

CERTIFICATION

With the present, Rototec SpA declares that the two-chamber septic tanks it manufactures in linear polyethylene (PE) are conform for a Population Equivalent (P.E.) indicated in the technical data sheet and comply with the descriptions indicated by the Ministerial Committee for the Safeguarding of Water Resources against Pollution (dated 4 February 1977 and subsequent amendments and additions, published in the ordinary supplement to the O.G. No. 48 dated 21/02/77) for plant updating. They therefore respect the requirements of Legislative Decree No. 152 dated 03/04/2006 and subsequent amendments.

 

This certification is valid on condition that the plant is kept in regular service, subjected to periodic maintenance and is installed according to the methods indicated (see underground installation instructions). The manufacturer will not be held responsible in the event of incorrect installation or tampering.

 

This certificate does not constitute authorisation for the discharge, which must be obtained from the competent authorities who may define more restrictive discharge limits.

INSTALLATION INSTRUCTIONS

WARNINGS AND PRECAUTIONS

Warnings:

 

Prohibitions:

UNLOADING AND MOVEMENT

INSTALLATION INSTRUCTIONS

N.B. The best location for the tank is specified by the qualified technician according to his own thorough technical evaluation. These installation instructions provide the guidelines to follow during installation.

1. EXCAVATION

1.1 Excavate a hole of suitable dimensions with a flat bottom, leaving a space of at least 20/30 cm around the tank. In the presence of heavy soil (e.g. clayey subsoil) and/or groundwater, the distance must be at least 50 cm. Spread a 15/20 cm deep layer of 20 /30 mm washed gravel on the bottom of the excavation to allow the tank to rest on a uniform and level base. Excavated material must never be used as backfill.nThe excavation must be a minimum of 1 m from any structures.

 

 

2. BACKFILL AND FILLING

2.1 Place the totally empty tank on a bed of 20/30 mm washed gravel spread at the bottom of the excavation, gradually fill the tank with water and at the same time backfill with 20/30 mm washed gravel. Continue with successive layers of 15/20 cm, filling the tank and then backfilling with gravel. Fill the tank to 3/4 of its capacity and backfill the last 40 cm with topsoil (NOT clayey/silty material, NOT excavated material). To prevent excessive pressure on the tank, NEVER use backfill material with sharp edges.

In the case of a tank with outlet pipe (e.g. aerobic trickle filters or gravity balancing tanks) seal the outlet pipe with a removable cover, then fill-backfill until half way up the tank, as indicated. After this, remove the plug and complete backfilling. Do not allow standing water to form in the excavation.

N.B. For installation in more severe conditions (groundwater, clayey soils or in sloping ground), refer to chapter 3 “Exceptional Installation”.

 

 

 

2.2  After the tank has been filled and the excavation suitably backfilled, gradually cover with topsoil ((NOT clayey/limey material, NOT excavated material) or with lightened material, e.g. expanded clay, to a depth of 30/40 cm, leaving the inspection covers exposed. In this way, the area concerned is suitable for pedestrian traffic, while the transit of motor vehicles within 2m of the excavation is prohibited.

When installing treatment plants, leave the tank filled with water. However, when installing a water storage tank, leave it full of water until the ground has fully settled (minimum 7 days. This period may vary based on the assessment of the designer). N.B. To render the site trafficable by motor vehicles, refer to Chapter 4 “Trafficability”.

 

 

 

2.3 EXTENSION INSTALLATION

If the tank is installed at a depth of 30/40 cm and the site is to remain open to pedestrian traffic, it is advisable to install the Rototec PE extension directly on the inspection holes. In the case where the tank is installed deeper than that previously indicated and therefore install more than one extension, which is an unfavourable condition and is not recommended, adhere scrupulously to the instructions reported in Chapter 4 “Trafficability”. The technician responsible for the installation will follow the instructions reported in the two paragraphs according to the installation depth.

 

 

 

2.4 VENT CONNECTION

a) When installing a pump, internally or externally, ALWAYS install an open-air vent, free and correctly sized, to prevent the formation of a vacuum and deformation of the tank when the pump is running. After connecting the vent, make the connections and check them.

b) In order to prevent the formation of bad smells and enable the treatment plant to function efficiently, ALWAYS connect a pipe (PVC, PP or PE) to the connection point provided for the biogas vent on the tank. Run the pipe to the highest point of the building or along the downpipes, but in any case higher than the level of the roof.

The pipe indicated on the drawing for the vent is not included in the supply.